Urban areas
Foto: Vojta Herout

Community Center – All Together (Všichni spolu)

In addition to a meeting place for people, the Community Center All Together in Ostrava, Czech Republic pursues the resistance of its new building against drought and heat. Most roofs are covered with plants and paved areas allow water to soak in. Rainwater in the community center is retained in a tank and the centre uses a heat pump for heating and cooling.

Benefits of adaptation measures

 
What the measure addresses
Ostrava, just like other cities, is facing a gradual rise in average temperatures, heat waves and overheating of artificial surfaces. That is why the city district of Poruba considered climate change when building the community center and built a space where the temperature is pleasant even in hot summers. Partially green roofs retain water and relieve overloaded sewers during torrential rains. The so-called sensory garden full of perennials and herbs is also used for education. The idea of the project is to create a pleasant place for all members of the community even in times of heat and drought.
 
How it works
The Community Center uses several technical solutions that respond to climate change. Flat roofs are covered by plants. They protect the building from overheating in summer, while in winter they serve as insulation against cold. Gradual evaporation of water during hot days helps to cool the surrounding air. Outdoor sports grounds and playgrounds are built of permeable surfaces that allow water to soak into the soil. Rainwater from the roof and paved surfaces is drained into a retention tank and drained off into the lawn or the Pustkovec brook in a controlled manner.

The building uses an ecological heat pump to maintain a comfortable temperature inside. While it heats it in winter, in summer it cools the building down. Orientation of the building according to the cardinal points was also considered as well as shading of all kinds, including planting of 45 trees and 70 shrubs. The plan is to plant 1230 trees, 3400 ivy plants and 614 herbs. The area of renewed greenery thus reaches approximately 2300 square meters.
 
Original state
Originally the place was an unused sports ground drained by drainage. The water was drained directly into the Pustkovec brook.

The Ostrava city district cut down a number of trees, but only those for which it was not possible to ensure a good and safe growth. These were mostly aged senescent Canadian poplars that were heavily infested with mistletoe, had damaged or infected roots and their operational safety was significantly lowered.

The rest of the felled trees were airborne species with unevenly formed crowns. In the majority of cases, these were older trees that do not normally get a formative pruning because it would cause mechanical and irreversible damage to the skeletal branches.

Therefore, suitable trees with good prospect were selected and got arborist treatment. More trees of species suitable for the site were planted.
 
Maintenance
The cost of operation and maintenance is estimated on the basis of experience with operation of similar facilities and amount to 140 000 CZK (5 500 EUR) per year.
 
Why it is not different
When it comes to water elements, only a drinking fountain is located in the Community Center and adding more water elements is not considered. However, there is a pond next to the complex that will be restored in the future. The roofs of the community center are covered with plants at the edges. The central part is lined with stones. This solution was chosen because there is a large room without columns under the roof and the roof covered by vegetation would be too heavy.

There is a risk for frogs that can jump from the pond nearby on the sloping roof all the way to the hot stones from where they may not be able to get back. Another risk is the visitors destroying the lawn, which is not yet properly estrablished, and, consequently, it disappearing. On the other hand, the plan is not to mow a part of the lawns at all and let the meadow species thrive.
 
The biggest challenges and obstacles
The major obstacle was the local communities not accepting the felling of fully grown trees. The situation was inspected at their initiative by responsible authorities that did not find any problems or mistakes.
 
How much it cost
The cost of building the Community Center reached 50 million CZK. It was funded by the Integrated Regional Operational Program (18 million CZK), subsidies from the budget of the Moravian-Silesian Region (2 million CZK), the Statutory City of Ostrava (15 million CZK) and by the city district of Poruba (15 million CZK).

The nature of the project and its focus on socio-economic benefits for the public does not assume generating profit. The return on investment is therefore not quantified. The expected lifetime of the investment is at least 50 years.

Public buildings Urban greenery Water purification and recycling Use of rainwater Heating Green roof Heat waves and thermal island Floods and torrential rainfall Lack of water and drought 

Locality:
Ostrava, Czech Republic
Realization:
07/2017-05/2019
Author:
PROJEKTSTUDIO EUCZ, s.r.o.
Contractor:
BYSTROŇ Group a.s.
Investor:
the Statutory City of Ostrava – the city district of Poruba
Contact:
Petra Musilová
pmusilovahaha.@moporuba.cz
“An interesting combination of adaptation to climate change and the providing services in a community center.”
RNDr. Radim Tolasz, Ph.D.
The expert jury member

Finálové projekty 2019

This site uses cookies. By clicking on “I accept” you agree with GDPR.
logo NP

Nadace Partnerství

Nadace Partnertsví (The Environmental Partnership Foundation) helps people care for the environment. It provides them with grants, professional services and inspiration from abroad. It encourages public involvement in tree planting, creation of high-quality public spaces, traffic calming, and sustainable tourism and cycling. It is based in Brno, Czech Republic, in Open Garden.

www.nadacepartnerstvi.cz

Adaptation Projects of the Environmental Partnership Foundation

LIFE TreeCheck
Open Garden
Tree of the Year

Contact Information

Nadace Partnerství
Údolní 33
602 00 Brno,  Czech Republic
Company Identification Number: 457 73 521

adapterra@nadacepartnerstvi.cz




© 2019 | Nadace Partnerství